Phone +49 209 9615-0 · E-Mail: info@easyklett.de

SINGLE PLY. SAFE. FLAME-FREE.
AN INNOVATION BY KEBU.

EASY INSTALLATION:
THE STEPS

ROLLING OUT HOOK TAPE

Roll out the hook tape in line according to the wind load calculation. Make sure the maximum distance between the two strips does not exceed 1.20 m. The tape has to be aligned diagonally to the wooden formwork or the corrugated metal roof.

 
PROTECTION STRIPS

Make sure to cover the hook tape with a metal strip before rolling out easyklett® to avoid unwanted sticking during rolling out or adjusting.

 
REMOVING THE COVERS

Remove the covers after rolling out easyklett® and press it on using your feet or a roller. Never adjust easyklett® by ripping it off forcibly!

 
CLOSING THE DIAGONAL JOINT

Close the diagonal joint at the head of the membrane using a hand-held hot air device and press it on using a silicon roller afterwards. Proceed likewise with all joints and ends.